Limited Time SaleUS$30.87 cheaper than the new price!!
| Management number | 233348601 | Release Date | 2026/06/27 | List Price | US$20.58 | Model Number | 233348601 | ||
|---|---|---|---|---|---|---|---|---|---|
| Category | |||||||||
Asta PowerProject Field Manual: Scheduling, Controls, Claims, and Handover for Infrastructure ProfessionalsThis book is for planners, schedulers, and project controls professionals who are expected to do more than build a schedule that looks good on paper. You are expected to defend it, update it under pressure, explain it to management, and rely on it when delay, recovery, and claims become real.Asta PowerProject Field Manual is built for the environments where schedule quality actually matters: live infrastructure work, contract scrutiny, owner review, monthly reporting, delay analysis, recovery planning, handover, and closeout.Built around a full infrastructure case study, this manual shows how Asta PowerProject is used in the real world, not in a classroom and not in a generic software tutorial.Inside, you will learn how to:• Build defensible baselines from day one• Strengthen logic before weak sequencing becomes project delay• Track progress with clarity, discipline, and credibility• Read critical path and float correctly under real project pressure• Analyze delay using Time Impact Analysis and Windows Analysis• Prepare recovery schedules that stand up in serious discussions• Handle handover, takeover, and closeout without losing controlThis is not a beginner walkthrough.It is not a watered-down overview.And it is not a generic software guide.It is a working field manual for professionals whose schedules must survive real project conditions.If your schedule will be reviewed, challenged, relied on, and possibly dissected later, this book was written for you.This book is for planners, schedulers, and project controls professionals Read more
| ASIN | B0GWWJNRG8 |
|---|---|
| ISBN13 | 979-8255895601 |
| Language | English |
| Publisher | Independently published |
| Dimensions | 7 x 0.62 x 10 inches |
| Item Weight | 1.34 pounds |
| Print length | 273 pages |
| Publication date | April 11, 2026 |
If you notice any omissions or errors in the product information on this page, please use the correction request form below.
Correction Request Form